what we shipped

Changelog.

Every public ship, fix, decision, and research dispatch. Velocity in writing. If this log goes quiet for more than 30 days, something is wrong — call us out on it.

2026-05-11
ship

Wave 6 — 10-item website push

  • —Interactive ROI calculator on the homepage
  • —/status page with component-level uptime
  • —/changelog (this page) for public velocity log
  • —Vertical programmatic SEO pages live
  • —Comparison pages (vs Smith.ai, vs Ruby, vs Vapi)
  • —Newsletter signup component sitewide
  • —Video testimonial layout with Goggins YouTube embed
  • —Live demo CTA wired (Twilio number to be provisioned)
2026-05-11
ship

Tool Vault icons + partner logos

  • —Replaced emoji icons with bespoke SVG strokes for every Tool Vault vertical
  • —Inlined Anthropic / OpenAI / Google / NVIDIA logos in the PartnersBar (killed CDN dependency)
  • —Removed unrealistic Testimonials section pending real client video
2026-05-11
ship

Waves 2 – 5 shipped

  • —/trust — Scale/Writer 5-block trust + security page
  • —/manifesto — 9-tenet operating doctrine with explicit refusals
  • —/stack — owned-stack differentiation thesis (Pipecat / LiveKit / Stagehand / browser-use / claude-mem)
  • —/demo-day — weekly live AI-build registration
  • —/restaurants/ai-audit, /trades/ai-audit, /law-firms/ai-audit — vertical audit landings
  • —Pricing modernization: Pilot tier free 14 days, setup waived on annual, Custom replaces "$7K+/mo" ceiling
  • —30-day fit guarantee badge under pricing hero
  • —About page rewritten in two-co-founder voice (Kadin + Jaiden)
2026-05-11
ship

Wave 1 — homepage spike

  • —New H1: "From ringing phone to paid invoice — automatically."
  • —TrustStrip below hero (data ownership / frontier stack / founder-led)
  • —ComparisonTable (Summit vs Human / Smith.ai / Ruby / DIY ChatGPT)
  • —StickyCTABar bottom-anchored after 800px scroll
  • —Hero proof-metric strip + footer rebuilt 4→5 col
2026-05-11
research

10 deep-research agents dispatched

  • —Anthropic-customer positioning · top AI agency design teardown · pricing/packaging
  • —SMB lead-gen tactics · trust signals · content marketing · trending GitHub skills
  • —AI voice receptionist landscape · founder-led GTM · landing-page conversion
  • —Master synthesis saved at vault/Ascero AI/Research 2026-05-11/
2026-05-11
fix

Live Claude chat (AskSummit) remounted on home

  • —Rewired the 478-line AskTilacum chat agent (was stubbed during rebrand)
  • —Verified raven-tools-omega.vercel.app/api/claude proxy POST 200
  • —Mounted at /ask-summit anchor for the hero secondary CTA
2026-05-11
ship

Recommended Partners section added

  • —PartnersBar component — Anthropic / OpenAI / Google / NVIDIA cards
  • —Each card explains the offering Ascero AI deploys from that stack
  • —Disclaimer that logos are nominative and Ascero AI is independent
2026-05-11
ship

Affiliates + Tool Vault surfaced

  • —PartnerProgramTeaser section on home
  • —Affiliates added to navbar (7 primary links)
  • —Footer expanded 4-col → 5-col, every previously-orphaned page now linked
2026-05-11
ship

Two case studies shipped

  • —SknnyChef rewritten to match current Inner Circle build (Shopify-native, founding-member, Robluna aesthetic)
  • —Goggins Real Estate — sourced from 2021 testimonial transcript (833 conversions / ~$11K spend / 10.4% CVR / $0.63 CPC)
2026-05-11
ship

Tools added to nav + ToolVaultPreview on home

  • —New ToolVaultPreview surfaces 9 vertical buckets on the home page
  • —Navbar gained Tools link
  • —Copy broadened from "trade businesses" to "small businesses" sitewide
2026-05-11
spec

Vercel subdomain claimed: asceroai.com

  • —Alias added to production deploy
  • —asceroai.com kept live for SEO continuity
  • —Real .com domain deferred until budget allocated
2026-05-10
ship

Ascero AI → Ascero AI rebrand complete

  • —Phases 0-8 of operator brief executed via ULTRAPROJECT
  • —11/12 acceptance criteria pass
  • —Live at asceroai.com · all routes verified · zero console errors
  • —Run report saved at Omega Project/Ascero AI/Summit-AI-Rebrand-Run-Report-2026-05-10.md